"Aviapolis Yankovsky" is
a project of the conceptual 
development of the production territory 
and the logistics area, located in the town 
of Artyom in Primorsky Krai.


 

 

On the area of 688 053 m2

It is expected to create a variety of manufacturing and logistics companies. Investors are provided  with the land with full engineering maintenance: electricity, water, sewerage.

Plan of the territory development:

 

In accordance with the concept of development,

Aviapolis territory is built in several stages:

  • The zero stage contains built objects of the Logistics Industrial Complex;
  • The first stage - built-up area of 19.6 hectares;
  • The second stage - built-up area of 58.5 hectares;
  • The third stage – built-up area of 37,59 hectares;
  • The fourth stage – built-up area of 31.96 hectares.

 

 

 

Development stages of the complex:

 

 

The infrastructure of "Aviapolis Yankovsky" now is:

 

  • Power supply 4.2 MW
  • Water supply 36 m3 / day
  • Sewage treatment plants
  • Stand-alone boiler plants to each warehouse
  • Fiber-optic communication Beeline. Microwave Communication MTS
  • Video surveillance
  • Cold water supply
  • Junction to the M40 highway "Ussuri"

 

Completed projects
warehouse B class

 

The first stage of construction:

Construction of a modern warehouse complex format B + with the area of 18,876 m2

The building was put into operation in April 2015.

One section - 936 m2 (12h78 m).

Column grid - 26h12 meters.

Working storage height - 8 meters (in the ridge - 12 meters).

Docks - 20 pieces. The floor is concreted with dust-free treatment. Autonomous boiler room, LED lighting. Fire alarm and fire fighting system. Parking for vehicles.

 

 

 






 

Warehouse B class logistik compleks

The second stage of construction:

Construction of a modern warehouse complex format B + with the area of 7488 m2

The building was put into operation in September 2015.

One section - 936 m2 (12h78 m).

Column grid - 26h12 meters.

Working height of the storage - 8 meters.

Docks - 14 pieces. The floor is concreted with dust-free treatment. Autonomous boiler room, LED lighting. Fire alarm and smoke removal system. Parking for vehicles.

 

 

 

 

 

 

 

 






Projects under construction

 

 

The fourth stage of construction:

Construction of modern warehouse space in format B with the area of 25669 m2

 

The deadline to ekspluatatsiyu in the first quarter of 2017.

One section from 700 to 1380 m2 .

Column grid - 24х12 meters.

The working height of the warehouse is 8 meters.

Docks - 20 pieces. Concrete floor with dust-free treatment. Autonomous boiler, led lighting. Smoke exhaust system. The fire alarm system. Parking for vehicles.

Completion date - II quarter 2016.

One section - 936 m2 (12h96 m).

Column grid - 24h12 meters.

Working height of the warehouse - 14 meters.

Docks - 40 pieces. The floor is concreted with dust-free treatment. Autonomous boiler room, LED lighting and smoke removal system. Fire alarm. Parking for vehicles.

 

 

 

Warehouse B class logistik compleks

The third stage of construction:

Construction of modern warehouse space in format A with the area of 28500 m2

Completion date - II quarter 2016.

One section - 936 m2 (12h96 m).

Column grid - 24h12 meters.

Working height of the warehouse - 14 meters.

Docks - 40 pieces. The floor is concreted with dust-free treatment. Autonomous boiler room, LED lighting and smoke removal system. Fire alarm. Parking for vehicles.

 

 

 

 

 

 

 

 






 

 

The third fourth stage of construction: 

Construction of modern warehouse space in format B with the area of 25 669 m2                                      

Completion date - I quarter 2017.

Column grid - 24h12 meters.

Working height of the warehouse - 8 meters.

Docks - 40 pieces. The floor is concreted with dust-free treatment. Autonomous boiler room, LED lighting and smoke removal system. Fire alarm. Parking for vehicles.

 

 

 

 

 

 

 

 






 

 

The fifth fourth stage of construction: 

Construction of modern warehouse space in format A with the area of 24 200 m2                                      

Completion date - III quarter 2017.

Column grid - 24h12 meters.

Working height of the warehouse - 12 meters.

Docks - 26 pieces. The floor is concreted with dust-free treatment. Autonomous boiler room, LED lighting and smoke removal system. Fire alarm. Parking for vehicles.